Camp Lejeune H-Style Building Renovations
听Location: 听Camp Lejeune, NC听 听 |听 听 Owner: NAVFAC听 听 | 听 听Client:听 Environmental Chemical Corporation
Following the aftereffects of Hurricane Florence, 91制片厂 was contracted to restore damages to Damages totaled over $3.6 billion with most of the significant damage including roof, exterior, and water damage.
This Design-Build full building renovation effort repaired all damage caused to four historic H-Style Buildings. Interior construction included new enclosed & open office areas, break rooms, conference areas, secure storage areas, code-compliant stairs, toilets/showers, all new interior partitions, doors, restrooms, ceilings, flooring, & finishes. A temporary satellite office complex created to relocate all H-Style building employees until construction was complete.
The building renovation was designed to meet 150 MPH wind per the Uniform Building Code for NC coastal regions, while exterior load-bearing studs were added to meet updated hurricane requirements.
Poettker simultaneously worked on the following Camp Lejeune projects to repair the damage incurred as a result of Hurricane Florence:
- Camp Lejeune 44 Building Renovations
- Camp Lejeune Warehouse Modernization Repairs
- Camp Lejeune Airfield Concrete Mats, Paving, and Infrastructure Repairs